You don't have javascript enabled. Good luck with that.
Pencarian
Alami Pendangkalan, Dermaga Pulau Tidung Dikeruk

Tidung Island Dock Dredged

The Tidung Island Dock, South Seribu Islands that experiencing shallowing is currently under dredging process. Thus the passenger and department boats can return docked without queuing due to narrowing of the docking pier.

By dredging deeper, the boats can dock first before dropping off the passenger in the dock

"By dredging deeper, the boats can dock first before dropping off the passenger in the dock," expressed Surahman, Head of Tidung Island Urban Village, Wednesday (1/27).

According to him, all this time, the passenger has to jump from one boat to another boat to ride and get off the boat in Tidung Island Dock. As for the dredging process, expected to be completed within three months.

PKL in Tidung Islands to Be Managed

"It is predicted to be complete in three months thus overload passenger can be minimized," he stated.

The dock in Tidung Island is divided into two paths, especially for boats coming from the Kali Adem Dock and Rawasaban Dock, Tangerang, Banten. Both paths are now experiencing shallowing and narrowing, thus the boat queue in tourists visit season is high.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5476 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4613 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1818 personTiyo Surya Sakti
  4. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1018 personAldi Geri Lumban Tobing
  5. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1017 personFakhrizal Fakhri